View Single Post
Old 4th October 2016, 06:29   #14546  |  Link
zazon
Registered User
 
Join Date: Sep 2004
Posts: 72
Quote:
Originally Posted by slalom View Post
Check fps on job window. If it is not correct, press Avisynth, then >, and select output speed, assume -> x.xx fps
Re-run the job
Thank you for the reply. If the movie is synced for the first half, but not the second half, how would changing the FPS fix this? I'm assuming FPS is a constant, though I don't know much. Thanks again.
zazon is offline   Reply With Quote