View Single Post
Old 17th October 2019, 19:31   #17541  |  Link
slalom
Registered User
 
slalom's Avatar
 
Join Date: Jan 2010
Posts: 456
Quote:
Originally Posted by Pauly Dunne View Post
So as great as DE is, there can be a LOT of time that the servers aren't doing anything..so if there was a way to have RB to at least start the next job, once the chunks of the previous job were completed, that could save a reasonable amount of time, and power.
But Temp disk is being used for the previous job, you will slow it down if the program starts a new job simultaneously
__________________
E5 2697 v2 @ 3.0GHz on P9X79 Deluxe 24GB
Xeon E5-2680 v2 @ 3.1GHz 16GB
Sony Vaio VPC-F13Z1E/B
slalom is offline   Reply With Quote