Quote:
Originally Posted by Pauly Dunne
So as great as DE is, there can be a LOT of time that the servers aren't doing anything..so if there was a way to have RB to at least start the next job, once the chunks of the previous job were completed, that could save a reasonable amount of time, and power.
|
But Temp disk is being used for the previous job, you will slow it down if the program starts a new job simultaneously