Quote:
Originally Posted by Katie Boundary
Yes but I'm asking how it chooses which frames to drop.
|
Each field will have a time stamp (I think), and the ones that are closest to the required output time (@23.976) will be kept, and the ones furthest from req time will be dumped. (methinks)
NOTE, fields (top and bottom) dropped rather than frames.