Welcome to Doom9's Forum, THE in-place to be for everyone interested in DVD conversion.

Before you start posting please read the forum rules. By posting to this forum you agree to abide by the rules.

 

Go Back   Doom9's Forum > Video Encoding > MPEG-4 AVC / H.264

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 9th October 2015, 21:12   #1  |  Link
kolak
Registered User
 
Join Date: Nov 2004
Location: Poland
Posts: 2,843
Advanced IDR frame placement

Have very specific IDR frame placement requirement for x264.

I want IDR frames to have min distance of 24 frames (and maximum of 99), but I don't want scene change detection to be off. In case there are scene changes happening inside 24 frames period I want 2nd one to be skipped. Is this possible at all with x264/ffmpeg?
Is the only way to let x264 create 1st pass and than analyse it and overwrite "broken" places with I frames?
Can I copy x264 frame decision from 1st pass and than adjust it (change "bad" IDR frames to I) and start new encode with this as qpfile?
Will this be ok? Is there a faster way?

Last edited by kolak; 9th October 2015 at 23:17.
kolak is offline   Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 04:01.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.